Segment at a Time Approach
From TIER
- Tower Height: 20 m
- Material: 3 segments of 2, 1.5, 1 inch diameter G.I. (water) pipes
- Pipe segments are 6 m, forced fitted together
- Tower is raised a segment at a time (more systematic approach)
- Difficult to put up the last (highest) segment
- Still need constant coordination with guy wires
- People can climb up this tower to do maintenance on the router/antenna
- Fixing guy wires can still be a challenge