Segment at a Time Approach

From TIER

  • Tower Height: 20 m
  • Material: 3 segments of 2, 1.5, 1 inch diameter G.I. (water) pipes
  • Pipe segments are 6 m, forced fitted together
  • Tower is raised a segment at a time (more systematic approach)
  • Difficult to put up the last (highest) segment
  • Still need constant coordination with guy wires
  • People can climb up this tower to do maintenance on the router/antenna

Image:Tower_10.JPG Image:Tower_09.JPG

  • Fixing guy wires can still be a challenge

Image:Tower_11.JPG